Student Placement Details
Batch : 2019-2023 (As on 27.07.2023)S.No | Reg. No | Name of the Student | Company Name |
---|---|---|---|
1 | 1916001 | ABINAYA N | REBAR DESIGN AND DETAILING,CHENNAI |
2 | 1916001 | ABINAYA N | CONEXRA BIM - QOSTEQ IT PRIVATE LIMITED* |
3 | 1916003 | ESHA DEVI M | COGNIZANT (CTS) |
4 | 1916004 | NAVIN KUMAR M | PINNACLE INFOTECH SOLUTIONS |
5 | 1916004 | NAVIN KUMAR M | CHINA RAILWAY 18TH BUREAU GROUP (UAE) |
6 | 1916005 | POOVALINGAM T | AARBEE STRUCTURES PVT.LTD. |
7 | 1916005 | POOVALINGAM T | CONEXRA BIM - QOSTEQ IT PRIVATE LIMITED* |
8 | 1916006 | SATHEES KUMAR.B | SPACESCAPE ARCHITECT,CHENNAI |
9 | 1916007 | SIVARAMAKRISHNAN M | RIDH ENGINEERING SERVICES |
10 | 1916008 | VISHALI M | RIDH ENGINEERING SERVICES |
Batch : 2018-2022
S.No | Reg. No | Name of the Student | Company Name |
---|---|---|---|
1 | 1816005 | JEYA RUBAL NANCY A | M/s.ACCENTURE,CHENNAI |
2 | 1816006 | V.RISHI KUMAR | M/s.COGNIZANT TECHNOLOGY SOLUTIONS(CTS),CHENNAI |
3 | 1816007 | MATHESH KUMAR K | M/s.RIDH ENGINEERING SERVICES,CHENNAI |
4 | 1816009 | SUJITHRA R | M/s.COGNIZANT TECHNOLOGY SOLUTIONS(CTS),CHENNAI |
5 | 1816011 | MAHARAJA P | M/s.ELITE ENGINEERING & CONSTRUCTION (HYD)P LTD,HYD |
6 | 1816012 | MAREESHAN V | M/s.ELITE ENGINEERING & CONSTRUCTION (HYD)P LTD,HYD |
7 | 1816013 | HERUTHICK SUNDAR S | M/s.ZOHO CORPORATION,CHENNAI |
8 | 1816014 | KASIM NIHAL | M/s.COGNIZANT TECHNOLOGY SOLUTIONS(CTS),CHENNAI |
9 | 1816015 | KAVIN P | M/s.ELITE ENGINEERING & CONSTRUCTION (HYD)P LTD,HYD |
10 | 1816016 | GURU VICKRAM E | M/s.ELITE ENGINEERING & CONSTRUCTION (HYD)P LTD,HYD |
Batch VI – (2017-2021)
![](https://nec.edu.in/wp-content/uploads/2023/04/5.-Placements-2017-21-1-scaled-copy.webp)
Batch V – (2016-2020)
![](https://nec.edu.in/wp-content/uploads/2023/04/4.-Placements-2016-20-1-scaled-copy.webp)
Batch IV – (2015-2019)
![](https://nec.edu.in/wp-content/uploads/2023/04/3.-Placements-2015-19-1-scaled-copy.webp)
Batch III – (2014-2018)
![](https://nec.edu.in/wp-content/uploads/2023/04/2.-Placements-2014-18-1-scaled-copy.webp)
Batch II – (2013-2017)
![](https://nec.edu.in/wp-content/uploads/2023/04/1.-Placements-2013-17-1-scaled-copy.webp)